Papalocal
Loading…
Papalocal · Things
Work

Cherry Street Strauss Trunnion Bascule Bridge

Cherry Street Strauss Trunnion Bascule Bridge is a bascule bridge in Toronto, Canada.

All 3 facts, and where they come from

Facts

3 facts · 0 confirmed by two sources · 0 cited · 3 from one source

What it is
bascule bridge One source
Located in
Toronto One source
Country
Canada One source

Where this comes from

Papalocal keeps its own record. It started from these sources; what each one said is kept here as it was copied, so a change on their side never changes this page by itself. Tap one to read its version.

What Wikidata says · copied November 17, 2026 · revision 2521878302
Described as
bascule bridge in Toronto, Canada
What it is
bascule bridge
Located in
Toronto
Country
Canada
Wikipedias with a page
3

Wikidata item Q5092482 (wikidata.org/wiki/Q5092482), public domain (CC0). Copied 2026-11-17.

What Wikipedia says · copied November 17, 2026 · revision 1334514944

The Cherry Street Strauss Trunnion Bascule Bridge is a bascule bridge and Warren truss in Toronto, Ontario, Canada. Located in the industrial Port Lands area, it carries Cherry Street over the Toronto Harbour Ship Channel and opens to allow ships to access the channel and the turning basin beyond. There was previously another bascule bridge further north on Cherry Street. The other, smaller bridge, crossed the Keating Channel, while this bridge crosses the Ship Channel.
The bridge was built in 1930 by the company of Joseph Strauss and the Dominion Bridge Company. The north side of the bridge has 750-ton concrete counterweights that allow the bridge to pivot to open. The bridge uses 500 tons of steel in its construction. The bridge is designed to carry two lanes of traffic. It cost CA$500,000 ($10 million in 2025 dollars) to build. It was officially opened on June 29, 1931 by Toronto Mayor William Stewart. The bridge was listed under the Ontario Heritage Act by the City of Toronto in 1992 as architecturally historical.

The city spent CA$2.5 million to refurbish the bridge in 2007. The Toronto Port Authority made further repairs from December 2012 to September 2013 at a cost of CA$2 million.
In 2021 the City entered into a funding agreement with PortsToronto (the "Owner") for the rehabilitation of the Cherry Street Ship Channel bridge approach spans and the Bascule bridge along with the authority to fund, from the approved 2021-2030 Transportation Services Capital Budget, the costs of the design and construction of these works, expected to total approximately $22.0 million over a period expected to be 2021-2025. In addition, and during the same timeframe, PortsToronto will rehabilitate the bridge's lifting mechanisms (mechanical and electrical) at a total cost of approximately $12.0 million. As of fall 2023, the City work on the approaches and foundations was almost complete and the bridge’s metalwork was to be repaired and repainted in 2024; however, As of 22 June 2025, that phase of work was still in progress.

From the Wikipedia article “Cherry Street Strauss Trunnion Bascule Bridge” (en.wikipedia.org/wiki/Cherry_Street_Strauss_Trunnion_Bascule_Bridge), by its contributors, under CC BY-SA 4.0 (creativecommons.org/licenses/by-sa/4.0/). Copied 2026-11-17; not changed.

Confirmed Two sources agree. Cited One source, and it names where it got it. One source One source, without a reference of its own. Sources disagree The sources disagree. We show the best-supported value and keep theirs below.

Picture: SimonP, via Wikimedia Commons · CC BY-SA 3.0

People connected 1

Known for it